Работа над проектом Southwest Corridor Light Rail Project была приостановлена в 2020 г. после того, как избиратели отклонили финансирование многочисленных улучшений транспорта из местного бюджета. В начале 2022 г. Metro, TriMet и Федеральное управление общественного транспорта завершили работу над итоговым заключением о воздействии на окружающую среду (FEIS) и выпустили отчет о принятии решения (ROD), чтобы проект в будущем имел право на финансирование из федерального бюджета. Посетите веб-сайт проекта Metro для ознакомления с этими документами.

Overall Project Improvements:
Bike and Walk Improvements

The project will add over six miles to the region’s system of bike facilities. Raised protected bike lanes are included between Barbur Transit Center and Naito Parkway. These lanes separate bicyclists from automobiles by a curb-protected furnishing zone. Other parts of Barbur Boulevard will consist of buffered bike lanes, which are striped cyclist-only lanes that create separation between cyclists and automobiles at street level.

Along Barbur, the project includes safer intersections that protect pedestrians and bicyclists from traffic. A full protected intersection (Type 1) provides separation and protection for bicyclists and pedestrians moving in every direction. Other types (Type 2 and Type 3) will be applied along the corridor as appropriate to address narrower roadways.

 

Pedestrian Improvements

A major benefit of the Southwest Corridor Light Rail project is the increased pedestrian permeability across Barbur Boulevard, making the crossings locations throughout the corridor as safe and comfortable as possible, while maintaining light rail operations and vehicular traffic. With guidance from PedPDX, Portland’s citywide pedestrian plan, the project increases the overall permeability of Barbur Boulevard through additional marked crossings. The design of crossing frequencies strives to meet a 530’ desired spacing within designated pedestrian districts and an 800’ desired spacing outside of pedestrian districts. More details on pedestrian crossings can be viewed in each of the station pages.

 

 

example

Pedestrian crossings

Bike Facilities

The project includes significant improvements to the bike facilities along Barbur Boulevard, allowing cyclists of all ages and abilities to safely and comfortably access destinations along the corridor. For four miles from Barbur Transit Center to Naito Parkway, this bikeway will consist of raised protected bike lanes. These lanes separate people on bikes from automobiles by a curb-protected furnishing zone. North of Naito Parkway, the street will include buffered bike lanes, which are striped cyclist-only lanes that create separation between cyclists and automobiles at street level.

The project also adds safer intersections that protect pedestrians and bicyclists from traffic through the intersection. A full protected intersection (Type 1) provides separation and protection for bicyclists and pedestrians moving in every direction. This design also requires space that will not be available at every intersection. Other types (Type 2 and Type 3) will be applied along the corridor as appropriate to address narrower roadways.

 

Barbur improvements map

bike facilities

 

raised protected bike lane

Raised Protected Bike Lanes cross section

 

Protected Intersection Type 1

raised protected bike lane

Protected Intersection Type 2

raised protected bike lane

Protected Intersection Type 3

raised protected bike lane

 

 

Комментарии или вопросы?

Позвоните по номеру 503-962-2150 или напишите по электронной почте для получения дополнительной информации.

 

 

Подпишитесь на новости по электронной почте


Партнеры проекта

TriMet Метро Департамент транспорта штата Орегон (ODOT) Округ Washington Город Durham City of Portland Город Tigard Город Tualatin