Работа над проектом Southwest Corridor Light Rail Project была приостановлена в 2020 г. после того, как избиратели отклонили финансирование многочисленных улучшений транспорта из местного бюджета. В начале 2022 г. Metro, TriMet и Федеральное управление общественного транспорта завершили работу над итоговым заключением о воздействии на окружающую среду (FEIS) и выпустили отчет о принятии решения (ROD), чтобы проект в будущем имел право на финансирование из федерального бюджета. Посетите веб-сайт проекта Metro для ознакомления с этими документами.

Inner Portland:
Marquam Hill Connector

Marquam Hill, home to numerous health care destinations, residences and supporting businesses, attracts over 18,000 employees, patients, students and residents each day from around the region. To serve this major destination, the Southwest Corridor Light Rail Project will include a connection from the Gibbs Street Station on Barbur Boulevard, up the steep inclines toward Marquam Hill.

The short but steep distance up the wooded terrain requires some combination of pathways and mechanical facilities. In early 2019, a “Green Ribbon” committee (GRC) made up of design professionals, key project partners and Marquam Hill stakeholders, explored a wide variety of connector types including bridges, gondolas, escalators, tunnels and more.

Downtown Portland to Marquam Hill map

Downtown Portland to Marquam Hill

Inclined Elevator

An inclined elevator was selected as the preferred connector choice. Choosing the right connector involved multiple phases of robust public engagement and technical review, including analyzing the effects on Terwilliger Parkway — a historic park resource with Federal, state and local mitigation requirements. Of the different connection options explored, the inclined elevator received the most public support, and was found to have the least impact on Terwilliger Parkway.

An inclined elevator works similar to a standard elevator but provides horizontal and vertical movement. Inclined elevators resemble historic funiculars, found throughout Europe, the US, and Canada, but use modern technology. A contemporary example can be found in Edmonton, Canada.

Two elevator cabs, each with a capacity of 40 people, will run on parallel tracks to efficiently move people up the steep slope toward Marquam Hill. A trip in the elevator will take about 60 seconds.

From the top of the inclined elevator, at Terwilliger Parkway and Campus Drive, an accessible pathway will connect to elevators within the OHSU campus.

Riders will also be able to access Line 8-Jackson Park/NE 15th Ave here, which provides frequent, door-to-door service to many Marquam Hill destinations.

View of Gibbs Station and Marquam Hill Connector

View of Gibbs Station and Marquam Hill Connector

 

Profile and cross section

Cross section

 

Aerial of Connector Location

Aerial of Connector Location

View from Terwilliger

View from Terwilliger

View from funicular

View from funicular

 

 

Комментарии или вопросы?

Позвоните по номеру 503-962-2150 или напишите по электронной почте для получения дополнительной информации.

 

 

Подпишитесь на новости по электронной почте


Партнеры проекта

TriMet Метро Департамент транспорта штата Орегон (ODOT) Округ Washington Город Durham City of Portland Город Tigard Город Tualatin